News & Alerts

Image of the project proposed for 2336 Westwood

2336-2340 Westwood

Many of you will have noticed the recent demolition on the east side of Westwood Boulevard, mid-2300 block.  We have made contact with the owner/developer of the site and can share the following details about the proposed development:

  • The project is a 3-story + basement mixed-use building.
  • There will be retail/coffee shop at street level, with 17 enclosed parking spaces behind.
  • The 2nd and 3rd floors will be apartments (23 units).
  • Parking for residents (22 spaces) will be in an underground garage.
  • The proposed design concentrates much of the mass towards the Westwood side of the site, where the new building will have a maximum height of 45-feet.
  • Tiering in the rear reduces the height of the building to 25-feet at the east side of the site (closest to the homes on Glendon Avenue).

The developer would very much like to make a presentation at one of our monthly meetings, to introduce the project and address questions/concerns from neighbors.  We will facilitate this as soon as it is safe to resume our regular meeting schedule.

WSSM Zoom Board Meetings

Residents are invited to monthly WSSM Zoom Board Meetings on the first Tuesday of each month at 7:00pm. For access to the Zoom Link and Passcode, contact us via email at info@wssm.org at least 24 hours prior to the meeting. Please make sure that both your first and last name are listed on the device you use to log in.

Did you know?

Your membership makes our neighborhood stronger! Please consider becoming a WSSMHOA member.

Scroll to Top